G.C.R.T.A. (Greater Cleveland Regional Transit Authority): Track realignment to retire the Kingsbury Tunnels. Repair transit 600VDC Catenary.
O.D.O.T.: West 44st Bridge Cuyahoga Ohio. Built temporary Duct Bank on overhead truss. Pulled 5kv & 15kv 4/0 PILC cable. 13 circuits for Cleveland Public Power. Installed Duct Bank in new bridge, pulled in permanent circuits and removed temporary circuits.
Heidtman Steel: Replacement of all Lighting Arrestors (15kv) in substation. Re-termination of cables.
G.C.R.T.A. (Greater Cleveland Regional Transit Authority): Eagle Street Substation. High voltage cable testing & new terminations of cables feeding transformers.
Menards Distribution Center –
15kv Underground power system. Holiday City, OH
Field of Dreams –
12 Lighted ball fields and underground 15kv distribution. Wauseon, OH
Mac Steel. 120kv Substation addition. Monroe, Michigan.
Ethanol plant. 138kv Substation and overhead, 12.47kv distribution line.
Coshocton, OH
N.O.A.A. Power and telephone service to a meter to monitor the current flow
of the Maumee River. OH
First Energy. Transmission Line Tower repair. OH
Johns Mansville. 7200 volt overhead line relocation. Waterville, OH
I-280 Bridge Project. Toledo, OH
Traffic Control Communication Project. Toledo, OH
Street Scape. Findlay, OH
Street Scape and Traffic Signals. Bellvue, OH
Railroad Traffic Signal Preemption. Shaker Heights, OH
Toledo Speedway Lighting System. Toledo, OH
138kv Sub Station. Johns Mansville. Defiance, OH
Sun Oil, Overhead Powerline Construction. N. W. OH
Toledo Edison Insulator Replacement Project. N. W. OH
15kv Service for New Toledo Public Schools. Toledo OH
B.P. Oil, Overhead Powerline Construction. N. W. OH
Andrews Air Force Base. Underground Communication Cables